7/09 – One day push to start the railing installation. Got everything done except the drink rails. Each of the black aluminum balusters had to be cut to length. I purchased a metal cutting blade for my circular saw and cut them in their cardboard boxes, ten at a time. Save a ton of time over cutting them individually.
7/11 – Added the drink rails. Railings complete, other than by the stairs.




